A and B together can do a piece of work in 30 days. A having worked for 16 days, B finishes the remaining work alone in 44 days. In how many days shall B finish the whole work alone?
Solve this multiple-choice question and check the correct answer with its explanation below.
Answer options
Correct answer and explanation
Correct answer: 60 days
Explanation: ā Correct Answer: C. 60 days š Explanation: Let their work rates be A and B. We know 30(A+B) = 1 (whole work). Also, 16A + 44B = 1. Equating these: 30A + 30B = 16A + 44B. This gives 14A = 14B, meaning A and B work at the same speed. Since they together take 30 days, B alone would take exactly twice as long, which is 60 days.